PROJECT NAME BRIEF DESCRIPTION CLIENT COUNTRY START DATE
Saudi Aramco Direct Delivery Purchase Agreement Five (5) Years Service Contract for the supply of internal cement lined pipes of various sizes. Saudi Aramco KSA 2014
Rubber Lining of Various Components at Ghazlan and Qurayyah Power Plant Three (3) Years Service Contract for the application of rubber of various equipments and piping systems at SEC’s – Ghazlan & Qurayyah Power Plants Saudi Electricity Company (SEC) KSA 2013
Water Transmission System Line to Hail Village Application of internal cement mortar lining of free issue 106.5 km of 36″ diameter pipes and 6265/ea cutback joints at site NWC / Bin Sammar KSA 2013
Solids Holding Package (SP-3) – Yanbu Aramco Sinopec Refinery Export Facility (YASREF) Scope includes perform installation, all related civil works of the new utility pipelines for connections the existing tie-ins in the RC industrial area to the berth 69 ship loading facilities termal of the Yanbu Export Refinery. Saudi Techint KSA 2013
Luberef Yanbu Refinery Expansion Project Scope includes perform installation (with both Bell and Spigot joints and Butt and Wrap joints) of Underground 60″ dia. RTR piping including associated Civil Works. Samsung KSA 2013
Rabigh-II & Petrochemical Project (Uo1) Pckg Scope includes perform installation (with both Bell and Spigot joints and Butt and Wrap joints) of Underground 48″ dia. GRE/GRP/FRP/CS/SS piping including associated Civil Works. GS Construction KSA 2013
Inspection & Repair of Marafiq Seawater Return Lines from SAMREF and YANPET Plant Perform all operation works and services as required for the repair, integrity inspection (visual NDT & DT), failure analysis and life assessment of the seawater cooling return pipelines of SAMREF and YANPET plants. MARAFIQ � Agreement # 7300005700 KSA 2013
Water Supply to Riyadh City Application of internal cement mortar lining of free issue 120 km of 60″ dia. pipes and insitu cement mortar lining of girth weld joints at site NWC/RTCC KSA 2012
Main Water Transmission Line from Kholas, Rabigh to Jeddah City Application of internal cement mortar lining of free issue 109 km of 48″ dia. pipes and insitu cement mortar lining of girth weld joints at site NWC/Alishar Contr. Co. KSA 2012
Main Transmission Line from Hili, Yuba Al Lith Dams to Al-Shoaiba Plant (Ph-1 & 3) Application of internal cement mortar lining of free issue 115 km of 56″ dia. pipes and insitu cement mortar lining of girth weld joints at site NWC/Alishar Contr. Co. KSA 2012
Yanbu-Madina PH-III Water Transmission Line System Application of internal cement mortar lining of free issue 607 km pipes and insitu cement mortar lining of girth weld joints at site. The piping range starts from 12″ to 76″ diameter. SWCC/Sinopec KSA 2012
Transmitting Treated Water from Al Khobar to Al Hasa Application of internal cement mortar lining of free issue 182.2 km of 60″ dia. pipes and insitu cement mortar lining of girth weld joints at site SWCC/Sinopec KSA 2012
Strategic Plan for Riyadh WTS, CN # 18a Application of internal cement mortar lining of free issue 27 km of pipes. The pipe range is 56″ and 72″ diameter NWC / Group-5/ Al-Fahd Co. KSA 2012
Water Transmission System Line from Hilli, Youba & Laith Dams to Al-Shoaiba Plant, Phase-II Application of internal cement mortar lining of free issue 175 km of pipes and insitu cement mortarl lining of girth weld joints at site. The pipe range is 20″, 56″ and 60″ diameter MWE / Yuksel Insaat Saudia KSA 2012
Ras Al Khair – Hafr Al Batin WTS Application of internal cement mortar lining of free issue 402 km of pipes, fittings, drains, vents and insitu CML of field girth weld joints at site . The pipe ranging from 3″ to 44″ diameter SWCC/MLM KSA 2012
Strategic Plan for Riyadh WTS, CN # 12 Application of internal cement mortar lining of free issue 7.6 km of straight pipes. The pipe range is 56″ and 72″ diameter NWC / Pan Gulf Piping KSA 2012
Strategic Plan for Riyadh WTS, CN # 18 Application of external PE HSS and internal cement mortar lining field girth weld joints at site. The approximately quantity of joints is 2207 and the range of piping is 56″ and 72″ diameter NWC/CWC KSA 2012
Yanbu Export Refinery Project – EPC3 Package Scope includes perform all operations, works, services and other related activities requisite and necessary for the timely and satisfactory completion of Field joint Lamination of Reinforced Thermosetting Resin( RTR) Piping works. Saudi Aramco / MMG KSA 2011
Shah Gas Development Project, Package # 4, Utilities & Offsite Fabrication of carbon steel pipe spools as per the provided drawings for ADCDC � SGD, Pkg # 4, U&O Project ADGDC/ RI WLL UAE 2012
Interconnecting Pipe Racks SP6 Package (Ref No; 411031-SC04/00) of
Yanbu Export Refinery Project-S Phase-1
Scope includes perform all operations, works, services and other related activities requisite and necessary for the timely and satisfactory completion of Field joint Lamination of Reinforced Thermosetting Resin( RTR) Piping works. Saudi Aramco / MMG KSA 2011
Strategic Plan for Riyadh WTS, CN # 3a, 11, 15 & 16 Application of internal cement mortar lining of free issue 24 km of straight pipes. The pipe range is 56″ and 96″ diameter NWC / DongHo Korean Co. KSA 2011
Installation of 3RY-SH Crown Plates Supports and Modification of 2RY-RH Roof Tubes on QPP Units 1 & 2 Cut and remove existing installed temporary support plates and install new supports and plates. Saudi Electricity Company
(SEC)
Contract # 30721199/00
KSA 2011
Al Taif – Al Baha WTS Application of internal cement mortar lining of free issue 18 km of 40″ diameter cold bends. The angle of bends is between 5?-8?. SWCC / JPL KSA 2011
Al Taif – Al Baha WTS Application of insitu cement mortar lining of free issue of 40″ diameter field girth weld joints at site. The total quantity of joints is 12,950/each. SWCC / JPL KSA 2011
FRP/GRP Piping Field
Lamination Joint
– Supply of qualified Laminators for the field lamination (Butt and Wrap) work at HADEED Plant.
‘- Hydrotesting, Installation Alignment for all pipes, spools, and fittings.
‘- Execution of the Tie-In Work.
INBESCO SA
Order # 11010245 0E
KSA 2011
Strategic Plan for Riyadh WTS, CN # 13 Application of internal cement mortar lining of free issue 16 km of straight pipes and insitu cement lining of field girth weld joints at site. The pipe range is 64″, 80″ and 88″ diameter NWC / SEDER KSA 2011
Al Taif – Al Baha WTS Application of internal cement mortar lining of free issue 358 km of straight pipes, fittings, bends, drains, vents and insitu cement lining of field girth weld joints at site. The pipe range is 6″, 12″ and 40″ diameter SWCC / APPCO KSA 2010
Bab Gas Comression Project, UAE. Fabrication, welding, transportation of above & under ground piping, sizes ranging from 4″? – 18″? for Bab Gas Comression Project, UAE. ADCO / SK Engineering Co. UAE 2010
Shoaiba WTS, Ph-III Application of internal cement mortar lining of free issue 344 km of straight pipes,including bends, drains, vents and insitu cement lining of field girth weld joints at site. The pipe range is 44″ and 80″ diameter SWCC / RTCC KSA 2011
Taif 1B, 6B Contract Application of internal cement mortar lining of free issue 184 km of straight pipes. The pipe ranging from 40″ and 72″ diameter SWCC / SICEP KSA 2010
Ras Al Zaur – Riyadh WTS Application of internal cement mortar lining of free issue 535 km of straight pipes including bends, vents, drains and insitu cement mortar lining of field girth weld joint at site. The pipe range is 72″ diameter SWCC / MLM KSA 2010
Ras Al Zaur – Riyadh WTS, Pkg # B1 & B2 Application of internal cement mortar lining of free issue 535 km of straight pipes including bends, vents, drains and insitu cement mortar lining of field girth weld joint at site. The pipe range is 72″ diameter SWCC/ SSEM-RTCC-HAK Consortium KSA 2010
Strategic Plan for Riyadh WTS, CN # 8 Application of internal cement mortar lining of free issue 17.2 km of 80″ diameter straight pipes NWC / SICEP KSA 2009
Ras Al Zaur – Riyadh WTS, Pkg 2B Application of internal cement mortar lining of free issue 72″, 64″ & 48″ diameter straight pipes, total quanity of piping is 363 km repsectively. SWCc / RTCC KSA 2009
Rubber Lining of Various Components at Ghazlan and Qurayyah Power Plant Three (3) Years Service Contract for the application of rubber of various equipments and piping systems at SEC’s – Ghazlan & Qurayyah Power Plants Saudi Electricity Company (SEC) KSA 2009
NCP Contract # 8012 – Seawater Laterals NCP Seawater Laterals. Engineering supply and installation (with both Bell and Spigot joints and Butt and Wrap joints) of Underground GRP Seawater Laterals including associated Civil Works, Flow Metering System, Sluice Gates, and SCADA System. Saudi Polymers Co. (SPC) KSA 2009
Boiler Modification at Ghazlan Power Plant. Provision of fabrication and installation of boiler tubes retrofit, pressure parts and superheaters at Ghazlan Power Plant. Saudi Electricity Company (SEC) KSA 2009
NCP Contract # 8005 – Seawater Header Piping and Sumps Seawater Headers and Sumps. Installation (Butt and Wrap joints) of free issue underground GRP Piping, and Construction of Concrete Sumps for the Seawater System, including associated Earth Work. Saudi Polymers Co. (SPC) KSA 2007
Shuqaiq – Abha WTS, Phase-2 Application of internal cement mortar lining of free issue 913 km of free issue straight pipes including bends, vents, drains and insitu cement mortar lining of fied girth weld joints at site. The pipe ranging from 6″ – 64″ diameter SWCC / ASC KSA 2007
Strategic Plan for Riyadh WTS, CN # 5 Application of external PE HSS and internal cement mortar lining of 80″ duaneter field girth weld joints at site. The total quantity of joints is 550/each NWC / SICEP KSA 2007
Water Supply to Hail Village, Phase-I Application of internal cement mortar lining of free issue 220 km of 28″ diameter straight pipes and insitu cement mortar lining of fied girth weld joints at site MWE / RTCC KSA 2007
Eastern Province Phase II WTS Application of internal cement mortar lining of free issue 125 Km of straight pipes inclduing insitu cement mortar lining of fied girth weld joints at site. the pipe ranging from 24″ to 76″ diameter SWCC/ Yuksel KSA 2009
Kuwait Oil Co – FUP Project Fabrication, welding, painting and transportation of new carbon steel pipe spools, sizes ranging from 4″? – 24″? for Kuwait Oil Co. FUP Project. Approx. 200,000 dia-inch. Kuwait Oil Co. / SK Engineering Co. KSA 2006
Installation of FRP Pipes and Fitting at SIPCHEM – Jubail Installation (Butt and Wrap Joints) of free issue 28″ Dia., 30″ Dia., 48″ Dia., 68″ Dia. And 76″ Dia. FRP Pipes and Fittings for the cooling water supply and return pipeline of the JAC Plant. The scope also includes the installation of 18″ Dia. And 20″ Dia. RTRP (Adhesive Joints) Underground firewater pipelines and storm water pipelines. SIPCHEM KSA 2006
Installation of FRP Pipes and Fittings at Tasnee – Jubail Design, Supply and Installation (with both Bell and Spigot joints and Butt and Wrap joints) of 1600mm Diameter Underground FRP Pipes and Fittings including the supply and installation of Slucie Gates, Flow Metering Equipment. Samsung Saudi Arabia Ltd. KSA 2006
Desing , Supply and Installation of FRP Pipes, Sluice Gates and Flow Metering Equipment Design, Supply and Installation of 1600mm Diameter Underground FRP Pipes and Fittings (Bell and Spigot joints), Passavant Sluice Gates and Flow Metering Equipment for the Jubail Chevron Plant in Jubail. Saudi Chevron Philips Co. KSA 2006
Supply of Filter, tanks and mixtures Application of Rubber Lining of Tanks, Vessels and Pipe Spools at Ramsis Engineering Plant in Bahrain. Ramsis Engineering- Bahrain Bahrain 2004
SAFCO IV, Erection for Offsites & Utilities Offsite & Utilities Work including Prefabrication of Piping, Installation of Pipework & Equipment – SAFCO-IV Fertilizer Plant. SAFCO KSA 2004
Design, Supply and Installation of FRP Pipes, Sluice Gates and Flow Metering Equipment Design, supply and installation (Butt and Wrap joints) of Underground FRP Seawater Laterals, Sluice Gates and Flow Measuring Equipment; Above Ground FRP Seawater Return System. HADEED KSA 2005
SADAF Seawater Sturcture Rehabilitation Works for Seawater Structure for Saudi Petrochemical Company Plant in Jubail. SADAF KSA 2004
Installation of FRP Piping at SAFCO IV Expansion – Jubail Installation (Bell and Spigot joints) of Underground Cooling Water GRP Piping for SAFCO-IV Ammonia/Urea Plant in Jubail. SAFCO KSA 2003
Rehabilitation of Treated Wastewater Facilities – Contract # 575-C26 Trenchless Technology Pipe Rehabilitation, utilizing the Pipe Bursting technique. The Royal Commission
for Jubail & Yanbu
KSA 2003
Saudi Aramco Maintain Potential Project in Southern Area Provision of Automatic Welding Services (“RAYWELD” Process) of new 12″? – 24″? carbon steel pipelines Saudi Aramco KSA 2004
Qatif Water Injection Trunklines and Flank Lines Supply of Automatic Welding Services to 2500 no. joints on new 4″? -24″? Qatif Water Injection Trunklines and Flank Lines. Saudi Aramco – Qatif Operation Producing Dept. KSA 2003
Gas Pipeline for Riyadh Cement Plant. Provision of Automatic Welding Services to 200 no. joints on new 20″? Gas Pipeline for Riyadh Cement Plant Riyadh Cement Plant / Bin Quraya Est. KSA 2002
Design Supply and Installation of FRP Pipes and Sluice Gates Scope included design, supply and installation of new sluice gates, flow measuring equipment, new FRP (with both Bell and Spigot joints and Butta and Wrap joints) underground seawater pipes and rehabilitation of existing concrete laterals. Samsung Saudi Arabia KSA 2001
Haradh Gas Plant Provision of Automatic Welding Services to 5500 no. joints on new 20″? – 30″? Haradh Gas Gathering Manifolds and Transmission Pipelines Saudi Aramco KSA 2002
Rubber Lining of Various Components at Ghazlan and Qurayyah Power Plant Three (3) Years Service Contract for the application of rubber of various equipments and piping systems at SEC’s – Ghazlan & Qurayyah Power Plants. Saudi Electricity Company (SEC) KSA 2001
Installation of Boiler Tubes at Qurayyah Power Plant. Scope included the replacement of 600 Nos. of corroded tubes in each of 4 No. boilers at Qurayyah Power Plant. Saudi Electricity Company (SEC)
Contract # 83372/00
KSA 2001
Khobar – Hoful WTS Application of internal cement mortar lining of free issue 133 Km of 56″ diameter straight pipes and 8 Km of 16″ diameter inclduing insitu cement mortar lining of 56″ diameter fied girth weld joints at site SWCC / RTCC / A.HAK KSA 2000
Rehabilitation of Seater Intake at Qurayyah Power Plant. Project inlvoved design, fabrication, assembly, installation, testing and commission of 20 No. Continuous Chain raked Bar Screens (CCRBS). Saudi Electricity Company (SEC)
Contract # 83170/00
KSA 1999
Ghazlan (Rubber Lining) Application of Rubber Lining of 3″? -36″? pipes and pipe fittings at SEC – Ghazlan Power Plant – Phase 2. Saudi Electricity Company (SEC)/ SHAW NASS KSA 2000
Corrosion Repair and Protection Works
RC Contract # 560-SO6R
Corrosion Repair & Protection Works. The Royal Commission
for Jubail & Yanbu
KSA 1998
2nd Pipeline from Aramco’s Natural Gas Supply System to Saudi Iron and Steel Co. Installation of New Metering Skid from the Saudi Aramco Header to RC.
Hot taping the new 24″ line to exsting 24″ S. Aramco Header. Sacrifical anodes, cabling and reference electrodes to new 24″ diameter pipeline.
Saudi Iron & Steel Co.
(HADEED)
KSA 1997
Eastern Province WTS Application of internal cement mortar lining of free issue 140 Km of straight pipes inclduing insitu cement mortar lining of fied girth weld joints at site. the pipe ranging from 24″ to 60″ diameter SWCC / TEKFEN KSA 1997
Facilities Improvement at Hafar Al-Batin Complex. Project involved modification of the exisitng service center at Hafar Al-Batin Complex, providing New Fire Sprinkler in exisitng transportation departments equipment maintenance centre and site work. Saudi Electricity Company (SEC)
Contract # 82703/00
KSA 1998
Modifications to Exisitng Seawater Station Dismantling of exisisting piping and equipment to be replaced.
Supply and install new equipment incluciding 2 no. plate heat exchangers to the Plant Module A & B circuit DR and 1 No. heat exchanger to the Plant Module C circuit DR.
Saudi Iron & Steel Co.
(HADEED)
KSA 1997
Design, Supply and Install Steel and FRP Pipes, Fitting and Equipment at the Float Glass Plant – Jubail Supply and install:
Compressed Air System, Butane System, Closed Loop System, N2/H2 Distribution Lines, Potable Water Lines, Reclaimed Water Lines, Natural Gas Line and Cooling Tower Package.
Saudi Guardian International
Float Glass Co. Ltd.
KSA 1996
Relocation of Mobile Generating Units from Qaisumah Power Plant. The project covered the relocation of three (3) Gas Turbine Mobile Generating Units and their associated accessories from Qaisumah Power Plant to Juaymah, Shedgum and Faras Power Plants. Saudi Electricity Company (SEC)
Contract # 82557/00
KSA 1996
Float Glass Project – On-site Utilities Construction of On-site utilities and related work for the Float Glass Project. Saudi Guardian International
Float Glass Co. Ltd.
KSA 1996
Desing & Construction of Cooling Tower Pipework Design and construction of carbon steel pipework, racks and supports for diameters up to 1200MM. Installation of free issue cooling towers, sand traps, heat exchangers, pumps, valves and hydro cyclone. Saudi Guardian International
Float Glass Co. Ltd.
KSA 1996
Employee Activity Center at SCECO-East Central Traing Institure & Media Center at SCECO HQ. Scope included installation of new fence and gates, fire water system, tanks, pipe, pumps, pump shed, etc. Installation of Sprinkler system for the vehicle workshop and installation of electrical system. Saudi Electricity Company (SEC)
Contract # 82379/00
KSA 1995
Design and Supply of 2 Diesel Generator Sets at Salwa Power Plant. Supply and installation of 2 diesel generator sets and refurbishing / upgrading of exisitng swtchgears, control planels and annunciator panels and construction of a reinforced concrete building. Saudi Electricity Company (SEC)
Contract # 82302/00
KSA 1994
Habshan-Maqta-Taweela Gas pipeline Project Powercrete R-95, high build epoxy coating to fittings, valves and joints. Diameter 400 mm to 1300 mm. GASCO UAE 2013
SWSS from Fujairah To Abu Dhabi External Epoxy coating, Diameter 100 mm to 1200 mm ADWEA/ TRANSCO UAE 2013
West Qarna Gas pipe line project- Iraq Canusa HB-95, High Build Epoxy coating to pipe Bends, diameter 150 mm to 500 mm FLOUR- Exxon Mobil Bahrain 2013
Construction & maintenenanceof WDC-II Mina Ahmadi North Kuwait Inetrnal & External Epoxy coating to pipe spools, Length 12.5 km and diameter 150mm to 2200 mm Ministry of Electricity and Water kuwait 2013
Natural Gas Pipe line to Hidd- SULB project External Fusion Bonded Epoxy Coating to pipes & bends, length 1.5 km and diameter 500 mm Bahrain Petroleum Company (BAPCO) Bahrain 2012
Shah Gas Project in Abu Dhabi Fusion Bonded Epoxy lining to piping spools, length 6.5 km and diameter 50 mm to 450 mm Abu Dhabi Gas Liquefaction Company (ADGAS) UAE 2011
KOC-North Kuwait New Booster Station BS-132 & Enhancement to BS-131 FBE lini+I8:I16ng of Flanges, Fittings and Field Joints, diameter 75mm to 600 mm Kuwait Oil Company kuwait 2011
MEW #58 / Mina Abdullah WDC II Pumping Station Cement Mortar Lining, Fabrication, HSS, Fusion Bonded Epoxy, length 6 km and diameter 75 mm to 2400 mm Ministry of Electricity and Water kuwait 2011
MEW #37 / Construction and Maintenance of 3x1600MM Dia. Fresh Water Pipeline from Mina Abdullah WDC II to West Funaitees Cemet Mortar Lining of Pipes and Field Joints, length 90 km and diameter 1600 mm Ministry of Electricity and Water kuwait 2012
LIWA – Strategic Water Storage/Recovery Cement Mortar Lining Pipes + Fittings / Field Joints, length 161 km and diameter 900mm to 1200 mm Abu Dhabi Water and Electricity Authority UAE 2011
Borouge 3 Utilities and Offsites Project Cement Mortar Lining Pipes + Fittings / Field Joints, length 2.4 km and diameter 100mm to 2700 mm. BOROUGE UAE 2011
Water supply system for Fujairah distribution network – N7396B Cement Mortar Lining to carbon steel pipes TRANSCO UAE 2011
EPC work for fire water backup pipeline at Mot Fujairah Cement Mortar Lining Pipes + Fittings / Field Joints HSS + Cement Mortar Lining, length 2.6 km and diameter 700 mm IPIC / ADCOP UAE 2011
Twin DN 1600 CS Pipeline from Tap ? Off 12 to Al
Ain Reception Center
Cement Mortar Lining Pipes + Fittings / Field Joints Cement Mortar Lining, length 55 km and diameter 200 mm to 1600 mm Abu Dhabi Water and Electricity Authority UAE 2010
Bab Gas Compression Project – Abu Dhabi Fusion Bonded Epoxy lining and external epoxy coating to pipe spools, length 22 km and diameter 75 mm to 450 mm Abu Dhabi Company for Onshore oil operation UAE 2010
Replacement of Steam Turbo – Generators at
No. 2 Power Plant
Fabrication and Cement Mortar Lining, 5 km and diameter 100 mm to 1200 mm Bahrain Petroleum Company (BAPCO) Bahrain 2010
KOC – Upgrading/Modification to Tankage, Injection Pump Seal, Water & Drainage System at MWIP Fusion Bonded Epoxy lining of Flanges, Fittings and GW Joints, diameter 75 mm to 600 mm Kuwait Oil Company kuwait 2010
KOC PROJECT NEW GC-24 / Process Piping Fusion Bonded Epoxy lining of Field Joints, diameter 75 mm to 750 mm Kuwait Oil Company kuwait 2009
GREAT MAN-MADE RIVER PROJECT
Ghadames � Zwara � Az Zawiyah Water System
Cement Mortar Lining Pipes + Fittings / Field Joints Cement Mortar Lining, length 23 km and diameter 1200 mm Great Man Made River Authority libya 2009
N5805 Fujairah Phase 2 Cement Mortar Lining Pipes + Fittings / Field Joints Cement Mortar Lining, length 130 km and diameter1600 mm Abu Dhabi Water and Electricity Authority UAE 2008
N-2622.1 Pipeline at Abu Dhabi Island and Adjacent Areas – Lot A, B, & C Cement Mortar Lining Pipes + Fittings / Field Joints Cement Mortar Lining, length 2 km and diameter 400 mm to 1600 mm Abu Dhabi Water and Electricity Authority UAE 2008
KOC, Stock of Drilling Pipes Rehabilitation Rehabilitation of 3.5″dia. Threaded Pipes, Cleaning Internal, Blasting and Painting/Primer coating external, Kuwait Oil Company Kuwait 2008
NEWater Submarine Pipeline and Services from Jurong Island to Pulau Ular / WSN-NW/3070071 Cement Mortar Lining of Pipe strings, length 4.5 km and diameter 800 mm Public Utility Board singapore 2008
KOC FMP PROJECT No. 05016D Facility Upgrade & Relocation U/G Process Piping of BS’s & GC’s Fabrication of Spools, Fusion Bonded Epoxy Lining, P external Liquid Epoxy; Fusion Bonded Epoxy lining of Field Joints, diameter 75 mm to 750 mm Kuwait Oil Company Kuwait 2007
ADGAS Offshore Associated Gases � Package 1 (OAG 1) for DAS ISLAND Cement Mortar Linng Pipes + Fittings / Fabrication, HSS, Painting, length 9 km and diameter 250 mm to 600 mm Abu Dhabi Gas Liquefaction Company (ADGAS) UAE 2007
Contract No. MPW/RA/125-Subiya Road (Package -2) Cement Mortar Lining of Pipes + Fittings / Field Joints HSS + Cement Mortar Lining / Fabrication of Fittings, length 4.9 km and diameter 800 mm to 1200 mm Ministry of Electricity and Water Kuwait 2006
Pipeline from Subiya WDC (E20) to Mutla WDC (E14) Subiya water distribution Scheme stage-II Cement Mortar Lining of Pipes + Fittings / Field Joints HSS + Cement Mortar Lining / Fabrication of Fittings, length 51 km and diameter 1200 mm Ministry of Electricity and Water kuwait 2006
MPA Contract No. 30/06.C04 Cement Mortar Lining of Pipes, length 13 km and diameter 250 mm J-Power Systems Corporation for the Maritime and Port Authority (MPA) of Singapore Singapore 2006
KNER-3060P / NEW ETHANE RECOVERY PLANT AT M.A.A. Cement Mortar Lining of Pipes and Fittings, length 4 km and diameter 100 mm to 1800 mm Kuwait National Petroleum Company kuwait 2006
TAZ Water Conveyance Pipeline System Cement Mortar Lining of Pipes and Fittings, length 5 km and diameter 1200 mm Great Man Made River Authority Libya 2006
Submarine Water Pipeline Sentosa Cove to the Southern Islands (KIAS) Cement Mortar Lining of Pipe strings, length 2.4 km and diameter 300 mm Public Utility Board Singapore 2006
SHUWEIHAT WATER TRANSMISSION SCHEME Cement Mortar Lining, length 1 km and diameter 1600 mm Abu Dhabi Water and Electricity Authority UAE 2004
CHANGI water reclamation Plant Contract C2B Cement Mortar Lining, 1 km and diameter 4500 mm Public Utility Board Singapore 2004
AL GARDABIYA / ASSDADA PUMP STATIONS PROJECT Cement Mortar Lining, length 5 km and diameter 3600 mm Great Man Made River Authority Libya 2004
C3 SUBIYA WATER TRANSMISSION – MEW/C/2874 Cement Mortar Lining Pipes + Fittings / Field Joints HSS + Cement Mortar Lining / Fabrication of Fittings, length 150 km and diameter 900 mm to 1200 mm Ministry of Electricity and Water kuwait 2004
Fujairah Water and Power Project (Pipelines) Cement Mortar Lining of Pipes, Fittings and Field Joints, length 360 km and 600 mm to 1600 mm Union Water Electricity Company UAE 2002